The stone work on the front of the house was completed yesterday and there are just a few more finishing touches that need to be done above the stone on the columns before we can say the outside is finished, but that said, it is finally looking a like the drawing on the header of this blog!
The landscaping has begun as well and as of yesterday we had a few plants that had been placed.
We had to stop by the house tonight and drop off two of our TV's which the AV guy will be installing for us tomorrow or Monday on the wall mounts. Figured it was better for him to mess it up than for us to on our own! Today landscaping rock was placed, some mulch and some decorative stones. It is dusk in these pictures so it is hard to see everything.
The other big development today was that not only was the port-a-potty taken away from our front yard, but the sprinkler system was also installed ... I will refer to this picture was Peter's Wall #2.
Lastly, for this update, is a shot of both sides of the patio in the backyard ... decorative rock has been place for the future deck and edging around the house. I believe the sod is set to arrive on Monday. We are waiting on the placement of six trees in the backyard until spring and then the landscaper will be back to place them for us.
No comments:
Post a Comment