More lights have been installed and actually hooked up to the electricity today as well. The stairwell lights were a new change for us as well as the dining room fixture.
Bruce, the tile and flooring guy, was hard at work with the master bathroom shower, the fire place hearth and the beginning of the back splash in the kitchen.
Another change today was that the closet shelving and has been started and nearly completed! The pantry is done:
Mudroom closet:
Master walk-in closet is in the process of being done. A shoe rack and a wall of shelving (not seen in this picture) still needs to be placed:
The girls' walk-in closets with the their passage way to the other girl's room are completed:
The garage/mudroom door has been painted and the main entry door has been stained and are ready to be installed before closing:
The AV guys has been busy wiring the house with speakers as well as the Direct TV connections, I call this "Peter's Wall":
The stone has been delivered and is ready to put into place on the front of house ... finally all the remaining green spots on the house will be covered!
And, last but not least ... the basement has had tack strips placed and carpeting will be going down in the next few days ... so excited to see the basement finished!