Wednesday, October 16, 2013

Start of Siding & More Prep Work for Tile

The rain finally let up this afternoon and hopefully the yard will start to dry out so that work become easier outside and landscaping can move ahead.

The siding was started today on the back of house and hopefully will be much more visible tomorrow:


We also noticed that we have an air conditioning unit installed along the side of the home:


The prep work for the tile and other flooring installation with the mud room having a subfloor material placed and the shower pan was poured today: